- •Contents
- •Unit 1. Bridges Classification.
- •Indication №1—by the main road function.
- •Indication №2 - by the superstructure material.
- •Indication № 3 – by a structural model.
- •2) Match the opposite adjectives:
- •3) Complete the sentences:
- •4) Change the sentences from Active into Passive Voice:
- •Unit 2. Bridge or Tunnel.
- •1) Find the equivalents:
- •2) Choose the best variant:
- •3) Find the opposites to the words:
- •4) Are the sentences True or False? Correct the wrong ones:
- •Unit 3. Reinforced Concrete Bridges.
- •1) Find the equivalents:
- •2) Choose the right answer:
- •3) Divide the words into pairs:
- •4) Fill in the blanks:
- •Unit 4. Beam bridge.
- •1) Decide whether the following statements are true or false according to the text:
- •2) List advantages and disadvantages for the beam construction used. Divide them into two columns:
- •1) Find the equivalents:
- •2) Match the synonyms:
- •Unit 1. Advertising.
- •1) Read and guess the meaning:
- •1) Match the verbs in column.
- •2) Match the types “the office joker”, ”the lazy worker”, ”the gossip” :
- •4) Find out four main office types in the text and describe them in details.
- •1) Look at the examples of the present perfect and past simple. Translate the sentences.
- •2) Complete the sentences.
- •3) Choose the correct words:
- •4) Choose the correct time preposition:
- •Unit 4. Success. Passion into profit.
- •1) Which location is best for each of the business activities 1-5? Choose from the list a-e.
- •2) Match the definitions 1-6 with a phrase combining a word from a and a word from b.
- •3) Guess what the definitions mean:
- •4) Use a collocation from exercise 2 to complete the sentences.
- •Unit 5. Image.
- •1) Match the words and phrases 1-6 with the meanings a-f.
- •2) Now complete the text below using the words and phrases from exercise 1.
- •3) Complete the dialogues with the phrases.
- •4) Complete the sentences with preposition:
- •Unit 6. Etiquette. Bad manners at work.
- •4) Complete the text with these words.
- •Unit 7. Data. No Privacy
- •1) Complete the dialogue with the correct form of the verbs in brackets.
- •2) Decide if the sentences below contain mistakes. Change the form of the verb where necessary.
- •1) Match the English and Russian equivalents. Make up the sentences with these words and word combinations:
- •2) Complete the sentences:
- •3) Complete the sentences using Present Perfect Active:
- •4) Complete the sentences using Present Perfect Passive:
- •Unit 2. Health and safety.
- •1) Match the Russian and English equivalents. Make up the sentences with these words and word combinations:
- •2) Is it True or False?
- •4) Form the adjectives using the suffixes: -ous, -ful,-able,-ant,-less, -ive and find the suitable nouns. Translate the phrases.
- •Unit 3. Civil construction.
- •2) Combine and translate combinations:
- •3) Complete the sentences:
- •4) Study the examples and form the comparative and superlative degrees of adjectives, find them in the text. Translate from Russian into English:
- •Unit 4. The building team.
- •1) Match the Russian and English equivalents. Make up the sentences with these words and word combinations:
- •5) Complete the sentences according to the text:
- •Unit 5. Construction materials.
- •1) Which of the properties of construction materials may be classified as advantageous? Disadvantageous?
- •2) Translate the following sentences. Mind the Complex Subject.
- •3) Give the English equivalents of the Russian words.
- •Unit 6. Building stones.
- •1) Decide whether the statements are true or false:
- •1) Decide whether the following statements are true or false:
- •1) Decide whether the following statements are true or false:
- •1) Match the English and Russian equivalents. Make up the sentences with these words and word combinations:
- •1) Match the Russian and English equivalents. Make up the sentences with these words and word combinations:
- •2) Read the definitions and write the suitable word:
- •3) Choose ing- form or infinitive after the verbs:
- •4) Translate the following sentences using the appropriate pronouns:
- •Unit 3. What is a computer?
- •1) Match the Russian and English equivalents. Make up the sentences with these words and word combinations:
- •2) Read the definitions and write the suitable word:
- •3) Fill in the prepositions:
- •4) Are the sentences true or false? Correct the sentences:
- •Unit 4. What is inside a pc system?
- •2) Read the definitions and write the suitable word:
- •3) Remember the meanings of modal verbs have to, must, should, need, may and fill in the gaps:
- •4) Translate from Russian into English using the modal verbs and infinitives:
- •Unit 5. Computer languages.
- •1) Match the Russian and English equivalents. Make up the sentences with these words and word combinations:
- •2) Read the definitions and write the suitable word:
- •4) Do you know the following abbreviations and acronyms? Decipher and translate them into Russian:
- •English in Highway Engineering. Unit 1. Problematic Passion of having a car.
- •1) Find the equivalents:
- •2) Complete the sentences choosing the proper variant.
- •3) Open the brackets:
- •Unit 2. How Traffic Problems Can Be Solved
- •1) Find the equivalents:
- •2) Translate:
- •3) Complete the sentences choosing the proper variant:
- •4) Translate using modal verbs:
- •Unit 3. Hurricane landfall site protection.
- •1) Find the equivalents:
- •1) Find the equivalents:
- •2) Translate:
- •3) Complete the sentences choosing the proper variant:
- •4) Rewrite the sentences from Active into Passive voice:
- •Unit 5. Road surface
- •1) Find the equivalents:
- •1) Find a word with opposite meaning.
- •1) Look at the words from the text and say what parts of speech they are.
- •2) Find in the text English equivalents to these Russian phrases.
- •3) Put the words in the correct order to make up sentences.
- •Unit 3. What is land cadastre.
- •1) Find in the text the synonyms of the following words.
- •2) Give Russian equivalents to English phrases.
- •3) Finish next sentences using the words.
- •4) Put the sentences from the text in the right order.
- •Unit 4. Role of the Government in Land Cadastre.
- •1) Translate some international words.
- •2) Find out the statements that are true. If the statement false, correct it.
- •3) Make up the comparative and superlative forms of the following adjectives.
- •4) Fill in the gaps with suitable model verbs should, can or must.
- •Unit 5. Problem of Automating Land Records.
- •1) Match a line in a with the line in b to complete a sentence
- •2) Decide if the sentences are true (t) or false (f).
- •3) Fill in each gap with a suitable word: render, integration, spatial, flexible, utility.
- •4) In the following sentences choose the right variant.
- •English in Quality Management. Unit 1. Occupation or Profession?
- •1) Wоrk with a partner. Maкe up a dialogue about the main idea of the text.
- •2) Translate and discuss.
- •3) Change the singular forms of the nouns into plural form. Is it possible to do in every sentence? Name the uncountable nouns.
- •4) Write a list of activities leading to a quality management in your future job. Mind the material of the text.
- •Unit 2. Getting the right staff.
- •1) Subdivide the text into parts. What part of the text answers the question: When are you lucky enough not to through away your advantage by employing the wrong person?
- •2) Underline the job mentioned in the text. Remember some other professions.
- •3) Tick the correct utterance:
- •4) Fill in the gaps with prepositions:
- •Unit 3. Forecasting
- •1) Define the main idea of the text. (1, 2, 3).
- •2) Are the sentences true or false?
- •3) Tick the correct sentence.
- •4) Find the sentences with Complex Object and translate them:
- •Unit 4.Optical Instruments
- •1) Match the words on the left with their meanings on the right.
- •2) Translate the sentences paying attention at the function of “it”:
- •3) What utterance is true: 1, 2, 3?
- •4) What sentence is correct:
- •Unit 5. Reinforced -Concrete Productiоn
- •1) Give equivalents to:
- •1) Find the English equivalents in the text:
- •2) Word formation. Translate the words into Russian and fill in the gaps with the proper word:
- •3) Use the or no article with the geographical names:
- •4) Discussion Corner.
- •Unit 2. Houston opens second light rail line
- •1) Find the English equivalents in the text:
- •2) Read the text again and say if these statements true (t) or false (f):
- •3) Fill in the gaps with the proper preposition using the text:
- •4) Fill in: will or be going to
- •5) Discussion Corner.
- •Unit 3.Railway stations
- •1) Find the English equivalents in the text:
- •1) Find the English equivalents in the text:
- •2) Word formation. Form the adjectives from the given words using these suffixes: -ic, -al, -ous, -less, -ive:
- •3) Relative clauses. Fill in the gaps in the sentences with which, who, where, when, whose:
- •4) Discussion Corner.
- •Unit 5. Double-deck train concept
- •1) Find the English equivalents in the text:
- •2) Read the text again and say if these statements true (t) or false (f):
- •3) Match different means of transport with their definition.
- •4) Modal verbs. Use can/can`t, must/mustn`t, have/don`t have to, should/shouldn`t, may or needn`t only once in the proper situation:
- •5) Discussion Corner.
- •English in railway maintenance. Unit 1. Earth track solutions – rails sleeper replacement, track maintenance and construction.
- •1) Find English equivalents to the Russian phrases in the text above:
- •1) Find English equivalents to the Russian phrases in the text above:
- •3) Put the words in the correct order to complete the sentence.
- •4) Complete the endings of the sentences from the text above:
- •Unit 4. Sperry Rail - rail flaw detection systems.
- •1) Find English equivalents to the Russian phrases in the text above:
- •1) Find English equivalents to the Russian phrases in the text above:
- •2) Match the words to their meanings:
- •3) Put the words in the correct order to complete the sentence:
- •4) Complete the endings of the sentences from the text above:
- •English in Tunnel Engineering. Unit 1. Tunnels.
- •1) Read the text again. Match headings a-g with paragraphs 1-7 of the text.
- •2) Match the given words with their definitions:
- •3) Give the Russian equivalents to the following English words and combinations.
- •4) Give the English equivalents to the following Russian words and combinations.
- •Unit 2. History of Tunneling.
- •1) Mach the given words with their definitions:
- •2) Give the Russian equivalents to the following English words and combinations.
- •3) Match the English equivalents to the following Russian words and combinations.
- •4) Translate the sentences below from Russian into English in writing.
- •Unit 3. The Channel Tunnel.
- •2) Give the Russian equivalents to the following English words and combinations.
- •3) Match the English equivalents to the following Russian words and combinations.
- •4) Put the given verbs into the correct tense forms. Pay attention on time words.
- •5) Translate the sentences below from Russian into English in writing.
- •Unit 4. Tunnel Jobs.
- •Exercises:
- •1) Work on lexis. Choose the word combinations from a. And b.
- •2) Read the text again. How many specialists are engaged in the tunnel construction process? What are their responsibilities at work? a. Match the jobs with the duties in the box.
- •B. Work in pairs. Ask and answer.
- •Vocabulary.
- •1. Put the phrases according to the suitable heading related to the Method of tunneling:
- •2) Give the Russian equivalents to the following English words and combinations.
- •3) Match the English equivalents to the following Russian words and combinations.
- •4) Read the text and put the verbs in the correct forms. Translate in writing.
- •Unit 6. Design and Construction methods.
- •1) Give the Russian equivalents to the following English words and combinations.
- •2) Mach the given words with their definitions:
- •3) Match the English equivalents to the following Russian words and combinations.
- •4) Insert appropriate verb:
- •5) Fill to in the blank with the suitable preposition:
Vocabulary.
review - обзор
include - включать
sequential - последовательный
mining construction - горное строительство
well-proven - хорошо зарекомендовавшей себя
accommodate - вмещать change - изменение
adopt – внедрять, принимать
overlapping - совмещение
carry out - осуществлять
similar - аналогичный
bulk excavation - объёмное копание, объёмное рытье
undertake - предпринимать
road deck - пролётное строениемоста
disruption - нарушение
environmental impact - воздействия на окружающую среду
dust - пыль emissions - выбросы impact - воздействие
explosive - взрывной
drilling rig - буровая установка
designated - назначенный
depth - глубина
detonator - детонатор
waste - отходы
hence - следовательно
measure - измерять
duration - продолжительность
appropriate - соответствующий
equipment - оборудование
competent rock -крепкая порода;твёрдая порода
|
|
TBM - туннелепроходческая машина
|
|
rock cutter - резец породный
|
|
roadheader - проходческий комбайн backhoes - экскаваторы
grouting - закрепление грунтов
freezing - замораживание
relocate - передислоцировать
Methods of tunneling vary with the nature of the material to be cut through. All the tunnelling techniques reviewed for possible use include cut and cover, drill and blast, bored tunnelling and sequential mining construction.
1. Cut and Cover Tunnelling. Cut and cover tunnelling is a common and well-proven technique for constructing shallow tunnels. The method can accommodate changes in tunnel width and non-uniform shapes and is often adopted in construction of stations. Several overlapping works are required to be carried out in using this tunnelling method. Trench excavation, tunnel construction and soil covering of excavated tunnels are three major integral parts of the tunnelling method. Most of these works are similar to other road construction except that the excavation levels involved are deeper. Bulk excavation is often undertaken under a road deck to minimise traffic disruption as well as environmental impacts in terms of dust and noise emissions and visual impact.
2. Drill and Blast. This tunnelling method involves the use of explosives. Drilling rigs are used to bore blast holes on the proposed tunnel surface to a designated depth for blasting. Explosives and timed detonators are then placed in the blast holes. Once blasting is carried out, waste rocks and soils are transported out of the tunnel before further blasting. Most tunnelling construction in rock involves ground that is somewhere between two extreme conditions of hard rock and soft ground. Hence adequate structural support measures are required when adopting this method for tunnelling. Compared with bored tunnelling by Tunnel Boring Machine (see below), blasting generally results in higher but lesser duration of vibration levels. A temporary magazine site is often needed for overnight storage of explosives.
3. Bored Tunnelling. Bored tunnelling by using a Tunnel Boring Machine (TBM) is often used for excavating long tunnels. An effective TMB method requires the selection of appropriate equipment for different rock mass and geological conditions. The TBM may be suitable for excavating tunnels which contain competent rocks that can provide adequate geological stability for boring a long section tunnel without structural support. However, extremely hard rock can cause significant wear of the TBM rock cutter and may slow down the progress of the tunnelling works to the point where TBM becomes inefficient and uneconomical and may take longer time than the drill-and-blast tunnelling method.
4. Sequential Excavation Method. This method is also known as the New Austrian Tunnelling Method (NATM). The excavation location of a proposed tunnel is divided into segments first. The segments are then mined sequentially with supports. Some mining equipments such as roadheaders and backhoes are commonly used for the tunnel excavation. The ground for excavation must be fully dry for applying the NATM and ground dewatering is also an essential process before the excavation. Another process relates to the ground modifications such as grouting, and ground freezing is also common with this method in order to stabilize the soil for tunnelling. This method is relatively slow but is found useful in areas where existing structures such as sewer or subway could not be relocated.
Answer the questions to the text.
1. What are the main construction technologies?
2. Why do they vary?
3. Speak on Cut and cover tunneling technology.
4. When is Drill and Blast Method used? What’s the advantage of it?
5. What is the key element of the tunnel construction Bored technology?
6. What does the New Austrian Tunneling Method technology allow?
Exercises: