Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
EXAM.docx
Скачиваний:
2
Добавлен:
28.09.2019
Размер:
486.11 Кб
Скачать

29. Find an optimal arrangement of objects using the modified method of triangle Schmigalla for subsequent transport intensity matrix

MIRROR SHIT

30. What factors influence the arrangement of objects?

  • material flow,

  • manufacturing organization

  • supply of energy (electricity, gas, heat, compressed air).

  • Supply and disposal of solid or liquid and gaseous substances

  • Building and construction technology as well as occupational health and safety technology

31. What are the advantages and disadvantages by Line arrangement of objects?

advantages

  • Favorable arrangement of material flow in floor and above ground transportation

  • Good use of daylight,

  • Installation of supply lines and waste lines possible well,

  • good disposal of solid, liquid and gaseous substances (e.g, Underfloor transport of waste production)

  • good linking of objects

disadvantages

  • Multiple machine operation => longer operator distances

  • Downward transport => Line Arrangement

32. What are the influences for object distances?

  • Dimensions of the objects

  • Operator repair, maintenance and other functional areas

  • Dimensions to be processed work pieces and transport equipment

  • Type of transport organization

  • Angular Arrangement of the objects to each other

  • Arrangement of objects to design parts of the building

  • Arrangement angle of the object to the transport routes

  • safety regulations

33. From which depends the building forms

  • selected equipment (objects, supply and disposal pipelines),

  • Selected arrangement of the objects (spatial structure).

  • 0 Selected material flow organization of transport equipment

  • 0 to be observed building laws Including Regulations

34. For a fixed number of objects (eg enterprises, sectors) that uniquely mapped to fixed points Fk ( by k = 1,2,...zF), is another object (eg a new central warehouse) on one of the possible locations Sj to place

=> transportation performance PT minimal (PT in t • m/ZE; ZE – Time Unit)

MATRIX

35. Describe the Varignon’sche Apparatus

TABLE WITH SHIT

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]