2. Match up the words on the left with the definitions on the right.

1) stratum (pl strata)

2) hill side

3) ambient

4) shaft

5) blast

6) descend

7) shift

8) mouth

9) altitude

10) strengthen

a) a long narrow passage that leads from the surface of the ground down to a mine

b) the entrance to something such as a cave (a hole in the side of a mountain) or a tunnel

c) a layer of a particular type of rock

d) existing or present around you

e) to destroy or move earth, rock using a series of explosions

f) a land on a hill below the top

g) to move an object from one place to another

h) to make something stronger so that it will take more weight or force without breaking

i) to become lower

j) the height of a place or thing above the sea level

3. Complete the sentences with the words.

1. We felt shock waves in the cavern floor as 80 m below ………. detonated.

a) hill side

b) shaft

c) explosives

2. The Gotthard Base Tunnel ………. through difficult geology.

a) bores

b) passes

c) goes

3. In the next 12 months work will get under way at the two ………. of Amsteg and Faido.

a) access adits

b) tunneling firms

c) site office

4. With the need to minimize ………. provision has been made to transport as much materials by rail as possible.

a) tunnel spoil

b) environmental impact

c) water-bearing rock

5. Work on the adits at Bodio and Erstfeld which will form the ………. of the new Gothard tunnel will follow later this year.

a) exploratory bores

b) trial bores

c) outer ends

4. With a partner answer the questions.

1. Who pressed the red button to set off the first explosive charges for the 800 m access shaft?

2. Is Gotthard tunnel one of the most expensive railway projects under way in the world?

3. What is the hardest part of the Gotthard project?

4. Will working simultaneously from five work sites reduce construction time?

5. What if the type of rock near by Furka base tunnel?

6. How many trial bores were made from around the site of access shaft at Sedrun?

7. What problem did the engineers encount after trial boring at Sedrun? How did they tackle the problem?

8. Was it possible to provide the direct rail-based excavation?

9. What was the depth of the running tunnel at Sedrun?

10. How will the tunnel spoil be reused?

5. Read the summary of the text and correct some technical mistakes.

Gotthard base tunnel in Alps is one of the largest civil engineering projects of recent years. It passes through difficult geology and at great depths beneath the Alps. Simultaneous work from three work sites will reduce construction time with the first train due to run through in 2011. The hardest part of the project – creating running tunnel through the most difficult geology. the rock is a type of sugar-crystal dolomite varying from water bearing rock to almost liquid. To chose the best technologies many exploratory bores were made.

The direct rail-based excavation was possible and to minimize the environmental impact it was decided to transport 50% of materials for the tunnel by rail. Special railway lines were constructed including signaling, power supplies and extra passing loops. The most of the materials for the tunnel transported by rail will be metal. Much of the tunnel spoil will be brought out by rail too.

A funicular railway has been installed to transport workers up and down the hillside.

Workfaces for the running tunnels will include:

  • a cavern at the bottom of the Sedrun shaft to provide space for moving equipment,

  • creating passageways and initial tunnel sections through the easy geology,

  • the twin tunnels and crosspassages which should connect with a drive from the Amsteg access,

  • a second face at Sedrun boring the tunnels south,

  • fitting out on the outer ends of the tunnel.

Many technical challenges lie ahead, but this huge project promises to transform the heart of Europe’s rail network.