The scheme of acceptance of laboratory control at work

hot asphalt concrete mix

(product name)

table 1.4

Name of the controlled parameters

Normalized value of the monitored parameters

Control method *, location of sampling

Tools, testing

Units that carry out control measures

Subdivisions (officials) or third-party organization**, performing control activities

Name of executive documentation, in which the control result is recorded

Official who responsible for supervising the activities assigned to the unit in accordance with 6 column in the table

Notes

1

2

3

4

5

6

7

8

9

10

1. Acceptance laboratory control

1.1 Mixture discharge.

1

Measuring the temperature of ready mix

The temperature at the outlet of the mixer 145-1550C

Acceptance. Every car

thermometer

ABZ

OKKDSM, SiM

Passport to a / c mix. release mixture log

Head of OKKDSM, SiM

2

Amount of discharged mixture

Compliance of discharged mixture with projected

Acceptance. Every car

Truck scales

ABZ

OKKDSM, SiM

Passport to a / c mix. release mixture log

Head of OKKDSM, SiM

1. 2 Laying of the mixture.

1

Measuring the temperature of ready mix

The temperature in the paver hopper 120 - 1550C

Acceptance. Every car

thermometer

Place of laying

OKKDSM, SiM

Passport to a / c mix. release mixture log

Head of OKKDSM, SiM

1.2 Cutting from the coating

1

Water saturation for the cutting from the coating,% by volume

Hot a / c mixtures

Type "B" is not more than 4.5

Acceptance.

Cutting from the coating

The vacuum device, press, tech. scales.

OKKDSM, SiM

----

Laboratory log

Head of OKKDSM, SiM

2

Compression ratio

For coarse-a / c mixtures of at least 0.98, and for the fine from 0.99

Acceptance.

Cutting from the coating

Press and scales

OKKDSM, SiM

----

Laboratory log

Head of OKKDSM, SiM

2. Periodic laboratory control

2.1 Dosing of mineral materials according to their moisture and asphalt batching

1

Granulometric composition of mineral mixtures. Humidity miner's materials. Dosing accuracy miner's materials

recipe

periodic, the method of cleaning solvent binder

A set of sieves, a set of laboratory equipment.

OKKDSM, SiM

---

Laboratory log.

Head of OKKDSM, SiM

2.2 Temperature mode in the preparation of mixture.

1

The temperature of bitumen.

Determination of t0

130-1500C

Periodic t0 working in the operating boiler

Thermometer

OKKDSM, SiM, OPVRiVNT

---

Laboratory log

Head of OKKDSM, SiM

2

Temperature of ready mix

t0 when releasing from the mixer

t 1450-1550

Constant in every car

Thermometer

OKKDSM, SiM, OPVRiVNT

---

Laboratory log

Head of OKKDSM, SiM

3

Mixing time

Mixing time, in seconds:

a) Dry -15

b) On the sandy bitumen. -45-60

fine-grained 30-45

c) coarse - 20-30

Acceptance

Operational laboratorial at ABZ

OKKDSM, SiM

---

Laboratory log

Head of OKKDSM, SiM

Executive order of registration documents.

When preparing hot asphalt mix is the executive documentation on the forms, according to the "Regulations on the Service laboratory control Rosavtodor", approved and entered into force on the order of the Russian Ministry of Transport 27.06.02 № IP-562-P

Table 9.1

Form

The name of the form

Frequency of management

Responsible for logging

1

2

3

4

5

1.

D-1

The log of samples of building materials

Every day and on admission of each batch of material and date of test

engineer-technician

2.

D -10

Crushed stone, gravel tests log

1 time in 10 shifts, and at new batches of material (acceptance control)

engineer-technician

3.

D -9

Sand tests log

1 time in 10 shifts, and at new batches of material (acceptance control)

engineer-technician

4.

D -12

Test logs of petroleum bitumen and polymer bitumen binders

Daily from the working boiler and from each bitumen car (acceptance control)

engineer-technician

5.

D -11

Mineral powder test log

On admission of each cement truck with mineral powder, and 1 time in 10 shifts

engineer-technician

6.

D -16

test logs of samples of asphalt mixes, taken from the mixer

At least once a shift

engineer-technician

7.

D -17

Test logs of samples taken from asphalt pavement

By acceptance of each section of asphalt concrete pavement. 3 cutting on 7,000 m2

engineer-technician

8.

D -18

Determining log of grain composition and content of the bitumen in a / c mixtures and asphalt concrete

At least once per shift and with changing of the look.

engineer-technician

9.

D -2 annex6

The act of sampling (samples)

For each batch of material to determine compliance with state standards.

engineer-technician

10.

D-25

The composition of asphalt mix

When material changed.

engineer-technician

Staff involved in the production process.

1. ABZ Master - one person.

2. An engineer-technician of second category - one person.

3. ABZ Operator - one person.

4. Welder - one person.

5. Electric - one person.

6. The loader driver - one person.

7. Bulldozer driver - one person

Safety.

  1. To autonomous work mixing engineer (operator) ABZ allowed persons over 18 years, successfully qualified for the job by a medical board, trained in safe methods and techniques for the production of papers and briefings on safety and having a license for the work of a machinist mixer (operator) ABZ.

  2. The driver of mixer (operator) ABZ passed an introductory briefing on safety, industrial sanitation, providing first aid, fire safety, environmental requirements, working conditions, the primary instruction in the workplace, as evidenced by the records in their respective journals with the mandatory signature of insrtucted and instructing.

  3. The driver of mixer (operator) ABZ know the operating instructions for asphalt plant.

All places of ABZ, hazardous fire condition (asphalt installation bitumen heating installation, bitumen), equipped with shields with fire appliances and equipment, fire extinguishers and charged cylinders, boxes with dry clean sand with lids.

Smoking is permitted only in designated places for these purposes.

To extinguish tanned bitumen or ignite the fuel used fire extinguishers and sand-or, the fire muted with tarp (tarp, caps, etc.).

  1. In the workplace, of mixer driver (operator) ABZ has a first aid kit with medicine and first aid to victims, and thermally isolated tank for drinking water.

  2. Breaks and passages between units of the plant at least 3 m from bitumen heating plants to other structures and combustible structures at least 50 m.

  3. Bitumen storage shall be fenced out of with fire protected materials with a minimum height of 1 m.

  4. At night ABZ area well lighted.

  • When unloading bitumen, arriving by train:

  • Under the wheels of cars recharged special shoes;

  • Check for serviceability of the valve is closed the steam jacket, valves, pipes and tanks, hopper gondolas, reliable connection to the hose nozzles (without missing a couple);

  • Exempt from the tank holders and upset by the signal of the responsible person or other motorized winch means. From the discharge should not be people within the 15-meter area.

  1. When unloading the tanks at the outlet to expose and securely fasten the tray for bitumen.

  2. Persons who are not related to the servicing of machines and plants are prohibited to be in the work area.

  3. In the conveyor galleries and trenches located under piles of rubble and sand between the conveyor and the wall, the passage width not less than 0.8 m, and between the two pipelines - not less than 1 m height of the walkway - not less than 1.9 m, and the gap between the most high part of the conveyor and the ceiling not less than 0.6 m, and from the transported cargo - at least 0.3 m from the ceiling. Stacks are protected and have signs prohibiting the "Entrance to the stack is forbidden, under the stack chute".

  4. Chutes, through which the gravel and sand fed to the belt conveyor, arranged at 1.5 -2 m, are equipped with reliable gates for controlling the amount of incoming material to the tape, and devices that prevent the freezing of these materials.

  5. The platform around mixing unit of the first and second tiers, as well as the ladder is securely fenced railing height of not less than 16% with a continuous closure meters in height 0.15 m above the ground, floors, solid and smooth.

  6. Belt, chain and gears, drive, tension reels, tensioners, etc., that can be accessed attendants, surrounded with protective netting, casings made ​​of sheet steel and other durable materials.

  1. Power and lighting wiring are protected from mechanical damage. Including circuit breakers protect electrical enclosures, and consumers of energy earthed power.

  2. Belt along the entire length of the passage must be equipped with emergency stop device from any location with a side of the aisle to serve.

  3. Conveyors designed for transporting powdered materials shall be equipped with dust suppression systems in the field of dust (place of loading, pouring, etc.).

Requirements before and during the work

  1. Getting to work, the mixer machinist (operator) ABZ should be put on provided clothing rules, with the hair should be removed under the hat, buttoned cuffs or sleeves tighten a rubber band.

  2. Before starting the installation of asphalt of mixer machinist (operator) ABZ should be:

  • Carefully inspect the installation and make sure it is good condition;

  • Check wiring and automation components and instruments;

  • Check the appropriate air pressure in the pneumatic system;

  • Check bitumen communication in the presence of bitumen to warm the frozen pipe and valves, heat the bitumen to the flowable state, only then can be turned on the engine pump the bitumen;

  • Test all components and assemblies of mixer, make a trial run bitumen pump supplying bitumen from bitumen heating aggregate to the mixer and back;

  • If there is no thermo-ABZ tank ready mix check of the vehicle during loading;

  • In the presence of thermo-tank check idling opening and closing the shutter hopper skip hoist operation;

  • Check the availability of staff;

  • To give a warning beep.

  1. If you are working on automated ABZ before each shift to check the serviceability of the wiring and components of automation, the mechanisms of local start-up of individual machines and devices, management tools (drive), with remote control - all instruments (units and installation) to start up in a strict sequence from the point of production to the ready mix point loading of raw materials.

  2. Let the asphalt concrete mixing is necessary in the following order: first, start the engine and check the car idling at work. If this fault is not detected, it should be light injector drying drum.

  3. During the asphalt concrete unit work mixer driver (operator) ABZ must ensure of:

  • Heating temperature of the mineral material in a drying drum, which should not exceed 220 ° C;

  • The pressure of steam in the steam generator, which should be within 5.8 kg/cm2;

  • The temperature of heating fuel, which should not exceed 70 ° C;

  • Heating temperature of bitumen (at 20 ° C lower flash point);

  • The work of the injector (the fuel must be burned without the black smoke).

  1. It is prohibited to open hatches of mixer during the work of unit to avoid burns.

  2. Do not use the drying and mixing drum at fault (burning) fireplaces, gas burners or nozzles for liquid fuel, as well as work drying and mixing drums on the mode with the release of flame burners into the atmosphere through a spark gap openings and the frontal part of the furnace or the annular gap between the shirts and wall furnaces, rotary reels.

  1. Serve cold mineral materials in the elevator should be only after a warm-up without drying drum load in 2-3 minutes.

  2. When loading the cold elevator materials (gravel, sand) should be placed in bins with windows or feed hopper. To collect the material bulldozed into piles taller than 1.5 meters and load the elevator of the piles, standing above them and pushing the material with a shovel, is prohibited.

  3. During operation, a screw conveyor or bucket elevator is forbidden to push the transported material, removing large pieces of hands or accidentally caught in a bucket or trough items.

  4. Pour the bitumen in the weight bucket and release it into the mixer and the mixing drum should be cautious, which is gradually opening valve to avoid burns hot bitumen.

  1. It is prohibited speed up the unloading of batches using the tools (crowbar, shovel, etc.) and measure the temperature of the asphalt mix at the time of her discharge.

  2. Inspect and repair the internal parts of the mixing bowl and of mixer should be only after the discharge of the mixture and the cooling drum mixer. To speed up the cooling is allowed to pass through a few batches of cold sand.

32. Prohibited during the work to clean the mixer, to strengthen, tighten and repair the parts of the machine, and wear and fold belts.

33. When working on automated ABZ should:

  • remote control to place away from the plants (at least 15 m) in order to ensure favorable sanitary conditions;

  • In the case of electro pneumatic drive air pressure to maintain about 7 kgf/cm2 on the control panel (in the dosing unit) and 3.5 kg/cm2 - in highways, repair and inspection of these sites is prohibited under the pressure.

34. Before the end of the shift all the mechanisms of re-taking power to take staff with a record in a removable magazine with a note seen defects and measures to address them. Log shall be regularly review the technical manager of the plant.